Saturday, October 29, 2022

Safety of RCC Demolitions and the Air Quality Index. Revisit the AQI for demolitions.

 

Premature demolition of housing societies-2

The Need to Revise the Air Quality Index.


By Ramaswami Ashok Kumar, B. E., M. E., Negentropist, Bombay Sarvodaya Mandal, 299, Tardeo Road,Nana Chowk, Mumbai-400007.

Invocation 

https://m.youtube.com/watch?v=JdoaQ-JNGdE&list=RD31vQFHBhJoQ&index=23


See the USEPA Table below published in its AIRNOW APP:














NOTE THAT ON ACCOUNT OF THE INFINITE BIOLOGICAL EFFECTIVENESS OF URANIUM 238 AEROSOLS OF 1 MICRON SIZE AND LOWER, ALL THE CATEGORIES OF AQI CHANGE FROM THE STATED AQI'S TO HAZARDOUS CATOGORY.

THUS THE PRESENT 153 FOR NAVI MUMBAI ON 29 OCTOBER 2020 at 9AM IST CHANGES FROM UNHEALTHY TO HAZARDOUS FOR RCC DEMOLITIONS:




SUGGESTED ACTIONS

 

NMMC MUST STOP SUCH PREMATURE ONGOING DEMOLITIONS BY APPLYING THE PRECAUTIONARY PRINCIPLE FORTHWITH.

ALL AUTHORITIES CONCERNED INCLUDING MPCB AND MOEF MUST REVISIT THE PREMATURE DEMOLITION OF HOUSING SOCIETIES IN THE MIDST OF YOUNG HOUSING SOCIETIES AND GENERATE DATA.

 

DEMOLITIONS MAY TAKE PLACE FOR ALL HOUSING SOCIETIES OF EQUAL AGE LIKE THE ONE IN VASHI AT SECTOR 17 UPON COMPLETION OF THEIR USEFUL LIFE ONLY.

 

THE RESIDENTS MUST NOT PAY FOR SUCH PROJECTS WITH THEIR LIVES AND INCURRED INVOLUNTARY DAMAGE TO THEIR HOUSING SOCIETIES.


For comparison we show CPCB NATIONAL AIR QUALITY INDEX:


 

Source Reference 3.

References

1. Ramaswami Ashok Kumar.2022. PERFECT DESIGNS: The dangerous urgent issues regarding premature demolition of some buildings within a settled community.blogspot.

 

Link:

https://livingnormally.blogspot.com/2022/10/the-dangerous-urgent-issues-regarding.html

 

2. USEPS APP Airnow.

3. https://app.cpcbccr.com/AQI_India/

Thursday, October 20, 2022

The dangerous urgent issues regarding premature demolition of some buildings within a settled community

 

Issues regarding the ongoing demolition at a Housing Society  Plot

R. Ashok Kumar, 1/13 Telec Officers CHSL, Plot 30, Sector 17, Vashi, Navi Mumbai-400703.

Invocation 

https://m.youtube.com/watch?v=h1zUcEC-gpA

Let the millions of  blows every minute of the demolishing machine of 2000W per hammer drill be replaced by the silent jhade laava khub khub so the Hoolock Gibbons enjoy their territories to the full!

Ongoing demolition without prior consultation with the affected surrounding buildings is going on adjacent to our society premises. This demolition is on 30 year old buildings whose normal life is 100 years whether near the sea or elsewhere. Our societies in the neighbourhood are also some 35 years old and have and extra 65 years to go. This demolition in the midst of settled communities is forcing us to become contaminated with heavy loud vibrations,dust and uranium phantom radioactive pollution having infinite biological effectiveness, with the high risk of us making the supreme sacrifice for the sake of the premature redevelopment. Our building structures are also being seriously affected. Are they causing the demolition of the surrounding structures as well?

Here is an SOS from us on the matter:

1. Health:

The uranium  dust being released by demolition has phantom radioactivity and has enormous affinity for our DNA and sits on the DNA cells emitting fast electrons with infinite biological effectiveness damaging both our somatic and germline cells and hence induces all types of illnesses. This results in our making the supreme sacrifice because of fatal uranium contamination of the body.

We are not prepared to make this supreme sacrifice for the sake of demolition.

2. Irreparable structural damage to adjacent buildings like our housing society. The blows being delivered by the dropping of the heavy chunks of concrete weighing some 9T or more causes some 100000 m/s/s uplift acceleration on 1 kg of our building foundation for about 0.1 sec. This is a vertical acceleration of 10000gs on 1 kg of the foundation for 0.1 sec. That is why we are constantly subject to sudden jolts lifting the building structure.

Because of their demolition I do not want our buildings to be damaged.

The other serious impact on the foundation is the explosive volume increase of the foundation mass because of 1000 blows per minute delivered by each hammer drill being used-each of some 2000W power. Probably 10 drills are being used simultaneously at 10000 blows per minute for 8 hrs. This may ultimately result in building collapse.

The details are in the URL below.

Reference:

https://livingnormally.blogspot.com/2022/09/safety-in-demolishing-rcc-structures.html